Lagan Group
Dew Piling
Search
 

Welcome

Welcome to FK Lowry Piling.

We provide foundation solutions throughout Ireland, operating on major multi-million pound schemes through to smaller residential developments.

Our market presence spans the entire island with landmark projects including Victoria Square in Belfast and Westgate in Dublin.

This website offers summary information on our company, our products and some sample projects. You will also find some useful technical reference material. Should you require further information please feel free to contact us.

Latest News

To download a copy of our recent brochure please click on the link below.


FK Lowry Piling is nearing the completion of piling works for Scheme 3 of the DBFO 2 road project at Ballygawley.


FK Lowry Piling were recently announced as winners of the Northern Ireland Safety Group, President’s Award for 2009 for Best Medium Sized Company.


FK Lowry Piling is delivering its largest ever project for long term client Sisk on behalf of aircraft manufacturer Shorts/Bombardier Aerospace.


FK Lowry Piling has completed the foundation project for a £100 million hospital redevelopment in Belfast as part of a major capital programme to improve health provision across Northern Ireland.


FKL wins first Scottish job

"
Kinlough, Co Leitrim

Featured Project
Kinlough, Co Leitrim

Kinlough, Co Leitrim

Contractor: Fergus Haynes Developments Ltd
Scheme: 93 No detached houses
Value: Approximately €1.3m

At Kinlough in County Leitrim, FK Lowry delivered the foundations for 93 detached dwellings piled to an average of eight metres, capped and beamed out within 16 weeks. The €1.3 million scheme for Fergus Haynes (Developments) was being constructed over a bog, with initial ground investigation showing varying levels of peat to rock and a high water table which ruled out traditional concrete foundations. Furthermore, tributaries around the site fed into Lough Melvin, one of Ireland’s best known fishing lakes so an environmentally sensitive piling solution was required.

FK Lowry’s precast system eliminated the need to dig foundations and to remove spoil, thereby reducing the risk of pollution to the tributaries. The technique also met the contractor’s need for fast track construction as the precast floor slabs and timber frames for the houses could be placed within 24 hours of the piling.

     
       
 
T: NI +44 (0)28 9250 1450; ROI + 353 (0) 71961 6866